Wilson Road and Rollins Road Drop Chamber Improvement

Project Location: Intersection of Wilson Road and Rollins Road in Ingleside. 

Project Description: The existing concrete drop chamber structure in the intersection of Wilson Road and Rollins Road was built in 1979 and is located in under the pavement. This drop chamber combines flows from 8” and 24” gravity sanitary sewers into a 42” interceptor sanitary sewer. This project will rehabilitate the concrete drop chamber structure in the intersection of Wilson and Rollins Roads and will rehabilitate the drop box structure located east of the intersection on Old Rollins Road. The project also includes associated by-pass pumping of sewer flows in the area in order to make the repairs.

Project Images

Anticipated Schedule: 

Final design is underway with construction anticipated in early 2021.